Walk the outside first - the approach road, the turning circle, the apron and the drains - then the roof and shutters, then the whole floor slab, then the switch room and services. Ask for the papers last, while the building is fresh in your mind: the fire certificate, a certificate of fitness for any lifting machinery, the title, and the floor loading in writing.
A factory viewing is not a house viewing
You are not deciding whether you like the space. You are deciding whether your process can run in it.
- Most of what matters is invisible: power, floor loading, the condition on the title, the certificates. Those are documents, not impressions.
- What you can see on the day is whether a lorry fits, where water goes, and whether the roof leaks.
- Apron and drainage: standing-water marks, settlement, cracking, and where rain goes
- Shutter and loading bay: measure the opening, and work out how a lorry turns into it
- Clear height in the hall: under the beam or the crane, not the ridge
- The floor: cracks, dusting and patches; the loading figure comes from the owner in writing
- Incoming power: the switch room and the main switch; amps and phases from the paperwork
- The office block: headcount, air-conditioning, toilets and escape routes
The order to walk it
- Outside firstThe approach road, the turning circle, the apron and the drains, before anyone opens a door.
- Then the envelopeRoof, gutters, walls and the shutter openings - from outside and from inside, looking up.
- Then the floorWalk the whole slab. Cracks, dusting, patches and levels tell you what has been standing on it.
- Then the servicesSwitch room, water, compressed air, drainage and waste - and whether there is room to add more.
- Papers lastWith the building fresh in mind, ask for the certificates, the title and the floor loading.
Photo for illustration purposes onlyThe papers to ask for
Fire certificateSection 28 of the Fire Services Act 1988 states that "Every designated premises shall require a fire certificate", and that "A fire certificate shall be renewable annually". So the questions at a viewing are whether this building is designated premises, and whether the certificate is current.
Certificate of fitnessThe Department of Occupational Safety and Health says lifting machinery is plant requiring a certificate of fitness under the Occupational Safety and Health (Plant Requiring Certificate of Fitness) Regulations 2024, and defines it as "any equipment used for lifting, raising, transporting, or lowering loads". Power-driven lifting machinery must have design verification and a valid certificate of fitness before it is constructed, installed or used. If the building has a crane, ask to see its certificate.
- The title: the category and express condition decide which processes may run there - see light, medium or heavy industry; tenure and the years left are in freehold or leasehold.
- Power: amps and phases come from the paperwork, not from looking at the switch room - see factory power.
- In a managed park, ask what the maintenance fee covers - see managed industrial park maintenance fees.
- Floor loading: ask the owner for it in writing rather than estimating it on the day.
Good signs, and signs to stop on
Good signs
- A clean, level slab with few patches
- Clear gutters and downpipes, no standing-water marks
- A tidy, labelled switch room
- An owner who can produce the certificates and the floor loading
Signs to stop on
- Fresh paint over water stains on the underside of the roof
- Long cracks or visible settlement in the slab
- An apron a container lorry cannot enter or turn in
- "We'll send the papers later", and they do not arrive
See it twice if you can
The same building shows you different things at different times of day.
- In the rain: roof, gutters, apron
- At the hottest hour: ventilation and office air-conditioning
- At shift change: vehicle access and parking
- With the owner present: ask directly
Write down what you saw, against the six numbers above, on the day. Not from memory afterwards.
Arranging a viewing? Tell Chris the size, power, location and timing you need.
Message Chris on WhatsAppPark guides: Welloyd Industrial Park, Meru, Eco Business Park V, Puncak Alam and NCT Smart Industrial Park, Kuala Langat. No building in mind yet? Start by writing the requirement. Buying? Line up the bank loan and its documents early.
Sources (2)
- Fire Services Act 1988 (Act 341), section 28, online version of updated text of reprint as at 1 October 2018, in the copy hosted by Universiti Teknologi Malaysia: Act 341 (PDF)
- Department of Occupational Safety and Health Malaysia, lifting machinery page (Occupational Safety and Health (Plant Requiring Certificate of Fitness) Regulations 2024): dosh.gov.my
Common questions
What should you look at first at a factory viewing?
The outside: the approach road, the turning circle, the apron and the drains, before anyone opens a door. A building a container lorry cannot enter is not solved by anything inside it.
Does a factory need a fire certificate in Malaysia?
Section 28 of the Fire Services Act 1988 states that every designated premises shall require a fire certificate, and that a fire certificate shall be renewable annually. The questions at a viewing are therefore whether the building is designated premises, and whether its certificate is current.
What certificate does a crane in a factory need?
The Department of Occupational Safety and Health says lifting machinery is plant requiring a certificate of fitness under the Occupational Safety and Health (Plant Requiring Certificate of Fitness) Regulations 2024. Power-driven lifting machinery must have design verification and a valid certificate of fitness before it is constructed, installed or used.
Can you tell the floor loading by looking at the slab?
No. Cracks, dusting and patches tell you what has been standing on it, but the figure itself has to come from the owner in writing.
How many times should you view a factory?
Twice if you can, at different times of day: in the rain for the roof and the drains, at the hottest hour for ventilation and the office air-conditioning, and at shift change for vehicle access.
What happens after the viewing?
Write up what you saw the same day, against each thing you checked. Then send the size, power, location and timing you need.