Most of what decides whether a factory works for you is invisible on the day: the power, the floor loading, the condition on the title and the certificates. This guide splits a viewing into what you can see, the order to walk it in, and the papers to ask for before you leave.

The short answer

Walk the outside first - the approach road, the turning circle, the apron and the drains - then the roof and shutters, then the whole floor slab, then the switch room and services. Ask for the papers last, while the building is fresh in your mind: the fire certificate, a certificate of fitness for any lifting machinery, the title, and the floor loading in writing.

A factory viewing is not a house viewing

You are not deciding whether you like the space. You are deciding whether your process can run in it.

  • Most of what matters is invisible: power, floor loading, the condition on the title, the certificates. Those are documents, not impressions.
  • What you can see on the day is whether a lorry fits, where water goes, and whether the roof leaks.
1 2 3 4 5 6
What a viewing looks at, in simplified section, not to scale.
  1. Apron and drainage: standing-water marks, settlement, cracking, and where rain goes
  2. Shutter and loading bay: measure the opening, and work out how a lorry turns into it
  3. Clear height in the hall: under the beam or the crane, not the ridge
  4. The floor: cracks, dusting and patches; the loading figure comes from the owner in writing
  5. Incoming power: the switch room and the main switch; amps and phases from the paperwork
  6. The office block: headcount, air-conditioning, toilets and escape routes

The order to walk it

  1. Outside firstThe approach road, the turning circle, the apron and the drains, before anyone opens a door.
  2. Then the envelopeRoof, gutters, walls and the shutter openings - from outside and from inside, looking up.
  3. Then the floorWalk the whole slab. Cracks, dusting, patches and levels tell you what has been standing on it.
  4. Then the servicesSwitch room, water, compressed air, drainage and waste - and whether there is room to add more.
  5. Papers lastWith the building fresh in mind, ask for the certificates, the title and the floor loading.
Two people in high-visibility vests and safety helmets on the concrete apron outside a factory unit, one holding a clipboard, with a drain along the foot of the wallPhoto for illustration purposes only
Walk the outside before anyone opens a door: the apron, the drain and the shutter.

The papers to ask for

Fire certificateSection 28 of the Fire Services Act 1988 states that "Every designated premises shall require a fire certificate", and that "A fire certificate shall be renewable annually". So the questions at a viewing are whether this building is designated premises, and whether the certificate is current.

Certificate of fitnessThe Department of Occupational Safety and Health says lifting machinery is plant requiring a certificate of fitness under the Occupational Safety and Health (Plant Requiring Certificate of Fitness) Regulations 2024, and defines it as "any equipment used for lifting, raising, transporting, or lowering loads". Power-driven lifting machinery must have design verification and a valid certificate of fitness before it is constructed, installed or used. If the building has a crane, ask to see its certificate.

Good signs, and signs to stop on

Good signs

  • A clean, level slab with few patches
  • Clear gutters and downpipes, no standing-water marks
  • A tidy, labelled switch room
  • An owner who can produce the certificates and the floor loading

Signs to stop on

  • Fresh paint over water stains on the underside of the roof
  • Long cracks or visible settlement in the slab
  • An apron a container lorry cannot enter or turn in
  • "We'll send the papers later", and they do not arrive

See it twice if you can

The same building shows you different things at different times of day.

  • In the rain: roof, gutters, apron
  • At the hottest hour: ventilation and office air-conditioning
  • At shift change: vehicle access and parking
  • With the owner present: ask directly

Write down what you saw, against the six numbers above, on the day. Not from memory afterwards.

Arranging a viewing? Tell Chris the size, power, location and timing you need.

Message Chris on WhatsApp

Park guides: Welloyd Industrial Park, Meru, Eco Business Park V, Puncak Alam and NCT Smart Industrial Park, Kuala Langat. No building in mind yet? Start by writing the requirement. Buying? Line up the bank loan and its documents early.

Sources (2)
  1. Fire Services Act 1988 (Act 341), section 28, online version of updated text of reprint as at 1 October 2018, in the copy hosted by Universiti Teknologi Malaysia: Act 341 (PDF)
  2. Department of Occupational Safety and Health Malaysia, lifting machinery page (Occupational Safety and Health (Plant Requiring Certificate of Fitness) Regulations 2024): dosh.gov.my

Common questions

What should you look at first at a factory viewing?

The outside: the approach road, the turning circle, the apron and the drains, before anyone opens a door. A building a container lorry cannot enter is not solved by anything inside it.

Does a factory need a fire certificate in Malaysia?

Section 28 of the Fire Services Act 1988 states that every designated premises shall require a fire certificate, and that a fire certificate shall be renewable annually. The questions at a viewing are therefore whether the building is designated premises, and whether its certificate is current.

What certificate does a crane in a factory need?

The Department of Occupational Safety and Health says lifting machinery is plant requiring a certificate of fitness under the Occupational Safety and Health (Plant Requiring Certificate of Fitness) Regulations 2024. Power-driven lifting machinery must have design verification and a valid certificate of fitness before it is constructed, installed or used.

Can you tell the floor loading by looking at the slab?

No. Cracks, dusting and patches tell you what has been standing on it, but the figure itself has to come from the owner in writing.

How many times should you view a factory?

Twice if you can, at different times of day: in the rain for the roof and the drains, at the hottest hour for ventilation and the office air-conditioning, and at shift change for vehicle access.

What happens after the viewing?

Write up what you saw the same day, against each thing you checked. Then send the size, power, location and timing you need.